Installing your BERG PlayBase yourself? Here's how!
With this step-by-step guide, installation becomes a manageable task. In eight clear steps, your PlayBase will stand firmly in the garden – ready for endless fun.
1. Unpack & organize
- Take everything out of the boxes and group the parts: top frame, sides/legs, connectors, bolts/nuts and accessories.
- Place a piece of cardboard or a tarp under the parts to prevent scratches.
- Keep small parts in containers or bags per step.
2. Prepare tools & workspace
- Gather the following materials: spirit level (or laser), tape measure, rubber hammer, socket wrench/spanners, drill/screw gun, spade/shovel, rake, long straight edge (2–3 m), work gloves.
- Working in loose or soggy soil? Keep stabilized sand/dry concrete on hand.
- Clear the workspace and ensure you can move around the equipment easily.
3. Loosely assemble frame
- First, assemble the top frame and tighten the bolts.
- Then, slide the sides/legs under the top frame and secure them as well so you can align it perfectly later.
- Assemble and move the frame with at least 3 people for control and safety.
4. Choose location and align
- Place the loosely assembled frame in its final position.
- Maintain 2.2 meters of free space around it for safe use.
- Determine where the ladder and tumble bar will be placed.
5. Mark out and dig
- Mark the leg positions by cutting around the turf and mark where the horizontal tubes will be.
- Move the frame aside and dig the holes and trenches according to the measurements in your BERG manual.
- Ensure the bottoms are flat and level; carefully save the turf for later replacement.
6. Place frame and level it
- Lift the frame into the dug holes and trenches with at least 4 people.
- Level the frame in all directions using a long straight edge and spirit level (or laser), and temporarily fix it with battens/wedges/stones.
- Measure diagonally to check if everything is square.
7. Backfill, compact & tighten
- Shovel the excavated soil back in layers: fill every 10–15 cm and compact firmly; repeat until ground level.
- In loose/soggy soil, (partially) stabilized sand/dry concrete can help for extra stability.
- Once everything is neatly in place, definitively tighten all bolts and rake the surface smooth; replace the turf.
8. Accessories & safety check
- Assemble accessories (swings, climbing wall, rings, nets…) according to their own manuals and check for free swing clearance.
- Perform a final check: level, bolt tension, play, and symmetry.
- Compact the ground a few more times over the next few days before fully loading the equipment.
🎉 Ready? Time to play!
Enjoy your BERG PlayBase. Questions or prefer to outsource placement? We are happy to help.
📸 Done? We're curious!
Great that your PlayBase is set up. Feel free to share a photo of the result — we'd love to see your work!
Do you still have questions or are you unsure about anything? Please send us a message, we're happy to help further.
Need help?
If you're stuck or want us to install it, feel free to call or email.